What are the town requirements?
What are the town requirements?
Some towns have requirements that are above and beyond the state requirements.
Please click your town below to see the additional requirements.
State requirements only
State requirements only
Town Fee - $20 if Title 5 failed or conditionally passed
State requirements only
State requirements only
Town Fee - $35
Cesspools result in failed Title 5
Town Fee - $100
Cesspools result in failed Title 5
Septic pumping is required unless proof of pumping within the last 6 months
Septic tank cover must be brought to grade
Distribution box cover must be brought to within 6 inches of grade
Filter is required
Garbage disposals must be removed by a licensed plumber
Septic tanks with a capacity of fewer than 1500 gallons and concrete baffle on the outlet is considered "needs further evaluation by the Board of Health"
Town Fee - $35
Hand auger below deepest leaching component or soil log after January 1, 1996
Cesspools result in failed Title 5
Water test required on all wells
Pits must have at least 6" clearance, 1/2-day flow capacity, and must be pumped
Town Fee - $25
Single Cesspool results in failed Title 5
Overflow Cesspool requires further evaluation
Town Fee - $55.50
Septic tank outlet cover needs to be within 12 inches of grade
If the Septic tank has two compartments, the inlet cover needs to be within 12 inches of grade
All plastic covers at grade must be weighted and screwed down
Gas baffle on outlet tee is required
Vacant properties need to be re-evaluated 3 - 6 months after normal consumption has resumed
Town Fee - $25
Cesspools result in failed Title 5
Septic tank needs a combined total of at least 1500 gallons
Septic tank more than 3 feet below grade must have a riser
Septic tanks more than 10 years old must be structurally certified by a Professional Engineer or Registered Sanitarian (PE/RS)
Town Fee - $50
Soil log required if not on file
Single Cesspool results in failed Title 5
Septic tank covers must be brought to within 6 inches of grade
Distribution box cover must be brought to within 6 inches of grade
Septic pits must be brought to within 6 inches of grade
Septic pumping is required if not done within last two years
Filter is required
Further Evaluation is required if < 100 feet from Monponsett Ponds or < 200 fee from Silver Lake
Soil log required if not on file
Town Fee - $25
Soil log required if not on file
Walk-through building is required
Water test required on all wells
Single Cesspool results in failed Title 5
Septic pumping is required
Septic tank outlet cover must be brought to grade
Distribution box cover must be brought to within 6 inches of grade
Filter is required
State requirements only
Town Fee - $25
Town Fee - $25
Town Fee - $50
Cesspools result in failed Title 5
Pits must have at least 6" clearance, 1/2-day flow capacity, and must be pumped
Filter is required
Water test required on all wells
Rental properties with a septic system over 20 years old must be re-evaluated every 3 years
Septic tank inlet cover must be brought to within 9 - 12 inches of grade
Septic tank outlet cover must be brought to grade
Distribution box cover must be brought to within 9 - 12 inches of grade
Vacant properties require further evaluationÂ
Town Fee - $35
Cesspools result in failed Title 5
Water test required on all wells
Single Cesspool results in failed Title 5
Soil log required if cesspool with leaching area
Town Fee - $50
Walk-through building is required
Cesspools result in failed Title 5
Exceed design for bedroom count result in failed Title 5
Inlet cover, outlet cover, pump chamber cover, and distribution box cover must be brought to within 9 - 12 inches of grade
Garbage disposal must be removed by a licensed plumber if the system didn't include the disposal in the design
Septic tank must be pumped after evaluation
Multi-unit houses, nursing homes, motels, and restaurants with onsite septic systems must be re-evaluated every 3 years
All commercial businesses with onsite septic systems must be re-evaluated every 5 years
Town Fee and water report - $58.49
Cesspools result in failed Title 5
Water test required on all wells
Soil log required or observed ground water in March or April
Filter is required
Septic tank covers must be brought to within 9 inches of grade
Distribution box cover must be brought to within 9 inches of grade
Septic tank must be pumped after evaluation
Working cesspools result in conditional pass and require tank and distribution box to be installed
Town Fee - $10
Filter is required
Cesspools result in failed Title 5
Cesspool includes any pit not made of precast concrete
Water test required on all wells within 100' of Soil Absorption System
Town Fee - $75
Cesspools result in failed Title 5
Septic tank must be greater than 750 gallons, if a pit then the septic tank must be at least 1000 gallons
Septic tank outlet cover must be brought to within 6 inches of grade
Distribution box cover must be brought to within 6 inches of grade
Septic pit must be inspected
Laundry pit is not allowed
State requirements only
Town Fee - $25
Town Fee - $50
Soil log if ground water cannot be determined through available records
Cesspools require tank installed between dwelling and cesspool provided it meets Title 5 Inspection criteria
State requirements only
Town Fee - $25
Soil log required or observed ground water in March or April
Town Fee - $25
Cesspools result in failed Title 5
Septic tanks more than 25 years old need further evaluation
Town Fee - $25
Cesspools result in failed Title 5
Water treatment system backwash must not enter the leaching system
Septic tank and distribution box must be accessible
Garbage disposal must be removed by a licensed plumber if the system didn't include the disposal in the design
Town Fee - $25
Cesspools result in failed Title 5
Garbage disposals must be removed by a licensed plumber
Town Fee - $25
State requirements only
Town Fee - $75
Cesspools result in failed Title 5
Water test required on all wells